Planned service interruption 19:00-21:00 17/12/2014

David Wibergh, about Status & transparency reports

Tomorrow (12/12/2014) we will have a planned service interruption which affects VPN02-04 between 19:00 and 21:00

The reason for the interruption is that we need to reconstruct our rack cabinet since we have purchased additional servers that need to be installed, as well as having to restart the switch.

VPN01 will be available during the entire maintenance.

Later this week we will open another server (VPN05), more details will be released once the server launches.

Update

The maintenance was delayed by about an hour, which means it took place at 20:00 instead of 19:00.

VPN02 had a few issues after the restart, which resulted in the server being unavailable between 20:10 and 21:17.

VPN03 came up quickly due to not encountering any issues. The server was unavailable between 20:21 and 20:33.

VPN04 hade precis som VPN02 några problem under uppstart, och det tog längre tid än förväntat att få igång servern. Servern var otillgänlig mellan 20:28-22:08

VPN04 had, like VPN02, a few issues during boot, and it took a bit longer than expected to get it up and running. The server was unavailable between 20:28 and 22:08.

David Wibergh